EDWARDSVILLE WATER AND WASTEWATER TREATMENT FACILITIES
2005 NCPPP Infrastructure Award Winner
Project Location: Edwardsville, Illinois
Public Sector Partner: City of Edwardsville
Contact Name: Ben Dickmann, City Administrator, 618.692.7530
Private Sector Partner: Veolia
Water North America - Central LLC
Contact Name: Angela Dye, Communications Manager, 317.263.6517
PROJECT SUMMARY
The City of Edwardsville and Veolia Water North
America - Central LLC first partnered in 1987 with a contract that included
operations and maintenance (O&M) of the City's wastewater treatment
plant. In 1992, the partnership's success led to an expansion of the scope
of work to include the management of the City's water treatment facility
and, in 2002, Veolia Water's contract with the City was renewed through
a 15-year agreement which included an $11 million in capital improvements
plan.
The City's facilities, a 4.28-million-gallon-per-day
(MGD) activated sludge wastewater treatment plant and a 7.78 MGD ground
water greensand filtration and zeolite softening plant, serve a population
of more than 39,000 people. Veolia Water operates and maintains these
facilities, which includes two remote pumping stations, seven wells, four
water storage facilities, 30 lift stations and 22 grinder stations.
The project has been awarded the Illinois Environmental
Protection Agency's (IEPA) Certificate of Excellence Award in Wastewater
Safety and Regional Plant of the Year Award and is twice a recipient of
Veolia Water's OPEX Award for excellence among the company's projects.
The wastewater treatment plant has also been a four-time finalist for
the IEPA Group I Operation & Maintenance Excellence Award.
The partnership has produced significant results, including:
$12 million savings in capital improvements
Veolia Water funded an $11 million capital improvements program to the
water and wastewater systems, saving the City approximately $12 million
on the capital work, compared to the City's estimates for the cost of
the improvements.
Not a single lost-time accident in 18 years
As a result of Veolia's commitment to creating a health-and-safety-conscious
culture, there has not been a lost-time accident in the 18-year O&M
history.
Superior water quality - 100% compliance
Through the partnership, Veolia Water has assumed full responsibility
for compliance and has delivered 100% continuous compliance since assuming
operations.
Superior environmental compliance - 99% compliance
Since the partnership began 18 years ago, there has been only one effluent
quality violation at the facility.
Technological Innovation and Cost Savings
Veolia Water's global presence in the water and wastewater industry brings
innovative technology and expertise to the City of Edwardsville. The partnership
has provided better technology and equipment solutions, which have resulted
in elevated process control, additional process flexibility, continuous
effluent quality compliance and improved asset performance. These solutions
contribute to the overall efficiency of the operations and help manage
and minimize the life-cycle costs of the water and wastewater facilities.
As highlighted below, Veolia Water and the City of Edwardsville
have executed significant capital improvements to enhance the quality
of the system. Veolia Water's capacity to fund, plan, and execute capital
improvements will provide a $12 million cost savings to the city.
Wastewater Facility Improvements:
- Completion of lift station upgrades for future growth.
- Completion of the design and installation of generator
sets for lift stations throughout the system to minimize and/or eliminate
sanitary sewer overflow (SSO) issues in the collection system.
- Completion of the design and installation of a Bioxide
feed system for controlling filamentous bacteria and odors at the wastewater
treatment plant.
- Design and construction of the new regional lift to
support increased residential and commercial development.
- Design and construction of the new West Interceptor
Phase II Corridor sewer to support increased commercial development.
- Completion of the 24-ince force main upgrade from
the "M" Street lift station.
Water Facility Improvements:
- Completion of the design and installation of a new
generator set at booster station #1.
- Completion of the installation of an 18-inch water
transmission line.
- Completion of the installation of a 6-inch service
line at the water treatment plant.
- Completion of the second phase of the water treatment
plant SCADA system upgrade.
- Design and construction of the east-west connector
water main.
Safe, Effective Operations
In 2004, the Edwardsville staff celebrated 18 years without a lost-time
accident, which can be attributed to a strong emphasis on operational
excellence, monthly safety meetings, peer audits and extensive training.
High-Quality Water and Wastewater Service
Since 1990, Veolia Water has generated more than 18 billion gallons of
drinking water with no regulatory violations for exceeding maximum concentration
limits. In regard to the wastewater treatment facility, Veolia Water manages
approximately 600 regulatory compliance samples each year. Of the nearly
18 billion gallons of wastewater that has been treated, only one effluent
quality violation has occurred.
|